Ara
Toplam kayıt 8, listelenen: 1-8
An integrated simulation model for analysing electricity and gas systems
(2014)
This paper aims at analysing the impacts of interdependencies between electricity and natural gas systems in terms of security of energy supply. When analysing both systems several interdependencies can be observed, however, ...
Traveling Repairmen Problem: A Biogeography-Based Optimization
(2022)
Traveling Repairman Problem (TRP), which is also known by names cumulative traveling salesman problem, the deliveryman problem and the minimum latency problem, is a special variant of Traveling Salesman Problem (TSP). In ...
The Efficiency of Variance Reduction in Manufacturing and Service Systems: The Comparison of the Control Variates and Stratified Sampling
(2009)
There has been a great interest in the use of variance reduction techniques (VRTs) in simulation output analysis for the purpose of improving accuracy when the performance measurements of complex production and service ...
Fractional Universal Kriging Metamodel
(2022)
In this study, a Kriging-based metamodel is proposed that can be used instead of the simulation model for complex problems where data generation with a simulation model may be costly. In this new model structure, which is ...
Modified self-adaptive local search algorithm for a biobjective permutation flow shop scheduling problem
(2019)
Interest in multiobjective permutation flow shop scheduling (PFSS) has increased in the last decade to ensure effective resource utilization. This study presents a modified self-adaptive local search (MSALS) algorithm for ...
WEEE estimation and determination of collection points: A case for the Municipality of Cankaya
(2018)
Electrical-electronic waste (WEEE) is generated from electric and electronic devices at the end of their lifecycles. When WEEEs are disposed, burned or disassembled for recycling, they are transformed into products containing ...
A Local Search Heuristic with Self-tuning Parameter for Permutation Flow-Shop Scheduling Problem
(2009)
In this paper, a new local search metaheuristic is proposed for the permutation flow-shop scheduling problem. In general, metaheuristics are widely used to solve this problem due to its NP-completeness. Although these ...
A New Multi-Echelon Repair Network Model with Multiple Upstream Locations for Level of Repair Analysis Problem
(2021)
Level of repair analysis (LORA) determines (1) the best decision during a malfunction of each product component; (2) the location in the repair network to perform the decision and (3) the quantity of required resources in ...